The industrial scheduling cockpit that tells the truth.

Scheduling productionManufacturing industry

DTSC CollectionConductorProduction schedulingS. AulotteNo. 12 12ConductorDTSC
CP-SATOdoo 18Finite capacityInteractive GanttLean Six SigmaNext.js

Conductor schedules the workshop at finite capacity from the ERP. The interactive Gantt keeps its safeguards, the cockpit shows where things are stuck, why, and with what impact. Every figure displayed names its source: nothing is simulated for show.

CP-SATOR-Tools solver
Odoo 18ERP connected
4 stepssee, understand, measure, act

Technical cross-section

Layers: interface, business, computation, data.

Interface
Gantt schedulepriorities, load and delays
Scenariossimulate before confirming
Business logic
Scheduling contracthard constraints kept separate from preferences
Locks and baseline scheduledo not undo what is committed
Computation
CP-SAT engineOR-Tools, explicit solve status
Greedy heuristica fast first solution
Data
ERP connectorOdoo, tested in the lab
Immutable revisionsevery plan keeps its version

What this volume demonstrates

Modelling a business as constraintsCapacities, dates, priorities: what is mandatory stays separate from what is preferable.
Integrating without imposingThe product plugs into the ERP in place instead of replacing it.
Keeping humans in controlLocks, baseline schedule and simulation before any confirmation.

Under the binding

Next.jsReactTypeScriptNode 20Python 3.11FastAPIOR-Tools CP-SATPostgreSQLDuckDBRedisOdoo 18

Acknowledged limits

Product under development. The exchange of plans with Operis is planned, not yet connected.